Stainless Steel POM Derlin Pinion Helical Gear for Printer

Description

Item Description

Goods Specifics

Merchandise Title Producer & Factory
Processing Range health-related gadget, aerospace & aviation, food tools, auto parts, electronics, and so on. 
Principal Items Gear, Spur gear, Ring spur gear, Bevel gear, Straight bevel gear, Spiral bevel equipment, Crown gear, Zero bevel equipment, Pinion equipment, Helical gear, Worm wheel, JCPT gear, Ring equipment, Worm gear, Worm and worm gear, Equipment box, Equipment reducer, Pace reducer, Equipment shaft, Sprocket gear, Spline gear, Spline shaft, Spline housing, Timing pulley gears, Transmission parts, etc.
OEM & ODM Availability Yes
Components Stainless Metal, Delicate Steel, Carbon Metal, Alloy Metal, Solid Iron, Iron, Brass, Bronze, Aluminum Alloy, and so forth.
Module 1. – eight., and so forth.
Size As necessity by JCPTer’s drawing, ISO normal
Coloration JCPT 
Max. Face Width Up to 300mm, diameter up to 550mm
Processing Technique Gear Hobbing, Equipment Shaping, Equipment Grinding, etc.
Tooth Encounter Hardness 55- 60HRC
Area Therapy Blacking, Polishing, Anodized, Chrome plating, Zinc plating, Nickel plating, and so on.
Treatment Quenching & Tempering, Carburizing & Quenching, Higher-frequency hardening, Carburization, and so forth.

Software
Spur gears are widely employed in development products, outboard motors, device instruments, lawn and backyard tools, marine hoists, multi-spindle drives, snow throwers, turbine drives, pumps, centrifuges and other power transmission tools.

Packing & Shipping
Packaging information: regular exported carton box.
Shipping and delivery of samples: By DHL, FedEx, UPS, TNT, EMS, and so forth.
Lead time: it will dependent on the buy quantity from JCPTers.

FAQ

Q1: Are you a trading organization or a manufacturer?

Manufacturer.

Q2: How prolonged is your supply time?

Normally, the samples supply is 10-15 days and the guide time for the official get is 30-forty five times.

Q3: How prolonged will it just take to estimate the RFQs?

Generally, it will take two-3 days.

This fall: Do you give samples?

Sure, the samples will be free if  the price is not way too large.

Q5: Which nations are your target marketplaces?

America, Canada, Europe, Australia and New Zealand.

Q6: Do you have experience of doing company with overseas JCPTers?

Of course, we have over ten several years exporting experience and ninety five% of our merchandise had been exported to abroad market. We specialised in the large good quality OEM areas, we are common with the normal of ANSI, DIN, ISO, BS, JIS, etc..

Q7: Do you have reference JCPTers?

Of course, we have been appointed as the provider of Parker(United states) considering that 2012. “Source the prime quality precision machined parts” is our management philosophy, ON TIME and EVERYTIME.